Below is an update on the construction progress for June 2025 at Sommét Blanc in Empire Pass at Deer Valley® Resort. Milestones include the installation of the roof and mechanical systems in Building C, the commencement of construction for the north half of Level Three in Building B, the completion of excavation and progress of foundation work for the south end of Building B, and the initiation of construction for the west half of Level Three in Building A.
Curious to see daily progress, view our live construction cameras on YouTube: https://www.youtube.com/@SommetBlanc/streams
Scroll down to view recent progress for the month of June in the sequential photos below:

Above: With most of the concrete work now complete and the building at full height, crews have been working on the installation of the roof for Penthouse C801. For the building units, interior framing and installation of plumbing, electrical, and mechanical systems continue. June 30, 2025.

Above: The Building B south elevator core continues to rise and will extend to Level Seven. Below, excavation has been completed, and installation of the foundation under the ’04 stack has begun. The black tarps shown are for waterproofing on top of the concrete base slab, in preparation for the massive steel rebar grid that will be placed before pouring the 3-foot-deep concrete slab foundation. June 30, 2025.

Above: The northern half of Level Two at Building B has been poured, and with the columns complete as well, crews are now setting up the temporary shoring deck to begin construction of Level Three. Also seen above is the concrete pour for the walls of the south elevator core. June 30, 2025.

Above: Another view of the excavation and early foundation and waterproofing work for the south end of Building B. June 30, 2025.

Above: A view of the multiple levels completed for Building B. Not visible is the Basement Level, which is completely below grade and located underneath the lower garage. The open garage, visible at the bottom, will soon extend underneath the Lobby to connect to Building A. June 30, 2025.

Above: The western half of Level Two at Building A has been poured, and with the columns complete as well, crews are now setting up the temporary shoring deck to begin construction of Level Three. The western elevator core is complete and rises to Level Six. June 30, 2025.

Above: An aerial view showing the entire site with Building A at the bottom left, Building B in the center, and Building C at the back. June 30, 2025.

Above: An aerial view showing the entire site with Building A at the left, Building B in the center, and Building C at the right. June 30, 2025.