Below is an update on the construction progress achieved in May 2026 at Sommét Blanc in Empire Pass at Deer Valley® Resort. Milestones include the substantial completion of the steel rooftop framing for the Level Seven Penthouse units in Building B, the construction of Level Five at the east end of Building A, the continuation of utility lines and mechanical systems in Buildings A and B, and the start of interior finishes in Building C.
Curious to see daily progress? View our live construction cameras on YouTube: https://www.youtube.com/@SommetBlanc/streams
Scroll down to view recent progress for the month of May in the sequential photos below:

Above: Building B now fully wrapped with scaffolding so crews can continue work on exterior wallboard, waterproofing, and prep for window delivery and installation. May 31, 2026.

Above: Interior finishes have started in Building C. Here, workers are installing hardwood floors over the acoustic layer. May 31, 2026.

Above: Wood ceiling installation is in progress for Building C. Shown here is the wood ceiling above the kitchen. Cabinets are on site, and installation starts within days. May 31, 2026.

Above: Another view of the wood ceiling installation in Building C. Shown here is the wood ceiling above the kitchen. Cabinets are on site, and installation starts within days. May 31, 2026.

Above: Tile installation has been underway for weeks now in Building C. Shown here are the natural travertine stone shower and walls in a Primary Bathroom. May 31, 2026.

Above: Exterior insulation and siding are nearing completion for Building C. The black metal sheets beneath the exterior decks and cantilevered spaces are also now being installed. May 31, 2026.

Above: Plumbing, electrical, and HVAC lines are progressing well at Building B. May 31, 2026.

Above: A view of the complex array of plumbing drain lines, fire suppression lines, plumbing supply lines, air handlers, and hydronic lines in Building B. May 31, 2026.

Above: The rooftop steel framing for Building B is now substantially complete. There are many steps and layers to these complex roof systems, and once the roof concrete is poured, framing for these penthouse units can begin. May 31, 2026.

Above: With the scaffolding in place around Building B, crews continue work on exterior wallboard and waterproofing. Window installation is scheduled to begin soon. May 31, 2026.

Above: The temporary shoring deck and vertical rebar columns are in place for Level Five of Building A. Crews have placed all plumbing sleeves and are working on steel rebar in advance of setting the PT-cables. Level Six should begin within a couple of weeks and will be the last level for structural concrete. May 31, 2026.

Above: A view of progress for mechanical lines including air handlers and their hydronic lines at Building A. Also in progress are electrical lines, plumbing drain lines, and plumbing supply lines. May 31, 2026.