Below is an update on the construction progress achieved in December 2025 at Sommét Blanc in Empire Pass at Deer Valley® Resort. Milestones include the construction of Level One to cap the Garage Level at the east end of Building A, the pouring of the last remaining below-grade concrete columns and walls at the Garage Level below the lobby connection, the start of Level Five at the south end of Building B, and the continuation of utilities, fireplaces, and drywall in the fully wrapped Building C.
Curious to see daily progress, view our live construction cameras on YouTube: https://www.youtube.com/@SommetBlanc/streams
Scroll down to view recent progress for the month of December in the sequential photos below:

Above: Looking down (right side) at the garage connection that will be underneath the Arrival Lobby. The crews are completing the waterproofing layer that will be underneath the concrete. The final site excavation is taking place at the top right corner, where a room will be built below grade to house electrical and mechanical equipment. On the left side of the image above, crews are placing a temporary shoring deck to create Building A’s Level One. December 10, 2025.

Above: The image shows crews working on an early-morning pour of concrete for the Garage Level floor that will connect the garages of Building A to Building B. December 12, 2025.

Above: The last of the remaining below-grade concrete walls and columns are mostly complete at the Garage Level, which connects Building A to Building B. Crews are pouring these final walls above. The temporary shoring deck is nearly complete, forming the cap of the garage below the Arrival Lobby. The work above shows crews removing large red blankets that protect the site from snow. Completing the last portion of the below-grade components is a significant milestone for the project. December 30, 2025.

Above: The southern end of Building B is rising quickly, with the elevator tower core already in place. Crews are currently working on setting plumbing sleeves and steel rebar for the formation of Level Five. December 30, 2025.

Above: Another view of Building B, Level Five, from the Ruby Express chairlift. Crews are placing plumbing sleeves and steel rebar. Soon, they will be ready to place the PT-cables and then pour concrete. On the northern end of the building, crews are working on the top of the north elevator core at Level Seven. Inside, most of the wall framing is complete, with mechanicals now being run. December 31, 2025.

Above: A view of the project from the ski beach in front of the Deer Valley Empire Canyon Day Lodge. Building C in the back is fully wrapped to protect the interior from the snow and cold. Building B is nearing its full height and mass. Building A at the front is partially wrapped with ongoing interior work in process. December 31, 2025.