Below is an update on the construction progress achieved in March 2026 at Sommét Blanc in Empire Pass at Deer Valley® Resort. Milestones include topping out of concrete at Level Seven of Building B, the start of Level Three at the east end of Building A, and the continuation of utility lines, mechanicals, fireplaces, drywall, insulation, and windows in the fully wrapped Building C.

Curious to see daily progress, view our live construction cameras on YouTube: https://www.youtube.com/@SommetBlanc/streams

Scroll down to view recent progress for the month of March in the sequential photos below:

Above: Crews wrapping up the final concrete pour at the southern half of Level Seven in Building B. This is the location of Penthouse B703. A major milestone for the project, this is the building’s final concrete floor. March 18, 2026.

Above: Crews working on the installation of steel columns and beams for the roof structure of Penthouse B703. After weeks of melting snow, another major, much-needed storm began rolling through. March 31, 2026.

Above: With Building B now topped out at Level Seven for concrete, crews are setting up temporary scaffolding around all four sides of the building to soon begin work on the exterior. March 31, 2026.

Above: At Building A, Level Two concrete has been poured, and crews are working on the elevator core and setting up the temporary shoring deck to begin Level Three. March 31, 2026.