Below is an update on construction progress for the end of February 2025 at Sommét Blanc in Empire Pass at Deer Valley® Resort. Milestones include concrete poured at Level Five and the start of horizontal shoring for Level Six at Building C, concrete walls and columns complete for the second Garage Level (P1) of Building B, and concrete columns complete and back-filling gravel for the first half of the Parking Level at Building A.
Scroll down to view recent progress from the photos below:

Above: View of Building C and the Lucky Jack ski trail. The yellow shoring assembly is for the start of Level Six. February 28, 2025.

Above: Steel stud framing of Residence C201 and C202 is nearly complete on Level Two of Building C. February 28, 2025.

Above: Crews are removing concrete forms from the recently poured elevator shaft shear walls at Level Five of Building C. February 28, 2025.

Above: A view of the concrete forms that wrap around the steel rebar columns at Level Five of Building C. These units have stunning views of Montage and Lady Morgan. February 28, 2025.

Above: Aerial view of the back corner of Building C, where the concrete slab was recently poured, with Buildings B and A below. February 28, 2025.

Above: Aerial view of progress of Building B and Building A. February 28, 2025.

Above: Crews are waterproofing the walls, and then back-filling massive amounts of gravel along the sides of the Bowling and Cafe Level of Building A (behind the plastic wrap). The columns for the Garage level are complete. February 28, 2025.

Above: A view of the entire site of Sommet Blanc, adjacent to the Lucky Jack ski trail and Ruby Express chairlift. February 28, 2025.