Below is an update on the construction progress achieved in July 2026 at Sommét Blanc in Empire Pass at Deer Valley® Resort. Milestones include the completion of the last remaining PT-concrete level in the project (Level Six in Building A), the construction of the penthouse roofs on Buildings A and B, the continuation of exterior wallboard, framing, utility lines, and mechanical systems in Building A, continuation of exterior waterproofing and window installation in Building B, and continuation of wood flooring, wood ceilings, bathroom tile, and cabinets in Building C.
Curious to see daily progress? View our live construction cameras on YouTube: https://www.youtube.com/@SommetBlanc/streams
Scroll down to view recent progress for the month of July in the sequential photos below:

Above: Crews pouring the final PT-concrete slab at Level Six of Building A. July 7, 2026.

Above: Interior finishes have started in Building C. The Poliform cabinets and some appliances have been installed in the kitchen of Residence C201. July 25, 2026.

Above: Another view of the Poliform cabinets and appliances in Residence C201. July 25, 2026.

Above: A view of continuing work for the fireplace in Residence C201. The wood floors and ceilings are complete, including installation of many light fixtures, speakers, and sprinkler head caps. The natural stone hearth is complete, and soon the metal face will be applied. Shade pockets in the ceiling for roller shades are also complete. July 25, 2026.

Above: A view of a Primary Bedroom closet built-in wardrobe. July 25, 2026.

Above: A view of a Bunk Bedroom custom cabinet built-ins. July 25, 2026.

Above: Exterior waterproofing and window frame installation on the backside of Building B. Also visible are the brackets for insulation and exterior siding. July 25, 2026.

Above: Exterior waterproofing and window frame installation at Building B. July 25, 2026.

Above: The backside of Building B where crews are working on the installation of the board-form concrete facade of the elevator columns. Also visible here is the continuation of work on the very complicated roof structures at Level Seven. July 25, 2026.

Above: An aerial view of all three buildings in relation to the ski run and chairlift. July 31, 2026.

Above: A view of the ongoing work to create the intricate design of the Penthouse roofs at Level Five and Six of Building A. July 31, 2026.

Above: A view of the scaffolding wrapped around Building B, with work continuing on exterior waterproofing, window installation, and the Penthouse rooftop construction at Level Seven. July 31, 2026.